PJK Consulting Engineering design, specified and developed all the electrical infrastructure supporting the data centers on all floors at CoreSite V7. Construction was planned and coordinated with teams of electrical constructors, general contractors and switchgear manufacturers so that the very tight schedules were met. We worked very closely with the CoreSite engineering and facilities team to implement a practical system which is concurrently maintainable.